Following the first week of introduction of the whole Spartan Superway Project, we were separated into different teams and sub-teams. Under the Full-Scale Guideway and the Bogie Team, i have chose to be part of the Wayside Power sub-team. The group members of the sub-team includes Tynan Winters and Donald Lou and myself. I have already started browsing the files in the website inist.org where i could find archives of past work and specifically about wayside power and the need for it. In addition, we are preparing for the three minute lighting talk about the purpose of our sub-team and the possibilities to implement one of the designs in the whole project.
The week after presentation, helped me to address very important details regarding the current insulator and rail. Also, it helped few modification on the current pick up mechanism to pivot about a joint. I have addressed those details as shown in the figure below. Using SolidWorks, I was able to calculate the tolerance angle as the current pick up mechanism is raised for a maximum on 1 in. a 10 degree angle will be used on the top pivot point. Additionally, I have sent the final drawing to Turpo Manufacturing company for fabrication. They will be machining some on the parts on this mechanism in exchange of advertising. finally I'll be working on the unistrust channels which will hold our current rail.
Comments
Post a Comment