Following the first week of introduction of the whole Spartan Superway Project, we were separated into different teams and sub-teams. Under the Full-Scale Guideway and the Bogie Team, i have chose to be part of the Wayside Power sub-team. The group members of the sub-team includes Tynan Winters and Donald Lou and myself. I have already started browsing the files in the website inist.org where i could find archives of past work and specifically about wayside power and the need for it. In addition, we are preparing for the three minute lighting talk about the purpose of our sub-team and the possibilities to implement one of the designs in the whole project.
For the past week, the team have modified the current rail and the current pick up mechanism. The figure above represent last year design. the figure above is the latest design The figure on the right is the mechanism that will make contact with the electric current rail. the legs (L-shaped) are design to fit the the width of the overall Guideway track.
Comments
Post a Comment