After hearing feedback from both Dr. Furman, Dan Espinoza and Ron Swenson about the safety of third rail system, the team we decided to change the proposal for fourth rail wayside power pick up.  This variation led me to focus on systems that use a fourth rail wayside electrical pick up.  I have found that the London Underground is a rapid transit system that uses this technique.
                                                                                                                                                                     
                             

Having settled on the system pick up. the next target was to decide what type of mechanism that is simple and efficient we can use for our current collector.
a simple spring damper system was proposed by Donald, I have made a concept design to be implemented as the mechanism to make contact with the current.
This concept idea was used for the first presentation and will be following on this design the following week.

Comments

Popular posts from this blog

WEEK 12: 3D printing for Prototype

This week is spent 3D printing all the parts for the prototype. The CAD is coming along however  3D printing takes longer because we depend Makerspace availability. This is the 3D printed part that will be attached to the body of the slave.  The plans is to secured, fixed (bolted) one side on the torsion spring (the outside) and  apply a force on middle legs. this will counteract  the force applied and create the 50N we expect. It was important to design a housing for the spring so we can attached to the spring and to legs. We are making iterations as we continue receive all printed parts. One important factor was how to hold on to the leg.  the next figures show the the changes.  These two figures are parts of the mechanism that will house the legs on the middle section. as we continue with these models we realized many iterations that have to made and  prototyping provide the opportunity to see that. the two figure will replace...

Week 5 (February 6,2019):Latest current pick up mechanism and current rail design

For the past week, the team have modified the current rail and the current pick up mechanism. The figure above represent last year design. the figure above is the latest design The figure on the right is the mechanism that will make contact with the electric current rail. the legs (L-shaped) are design to fit the the width of the overall Guideway track. 

WEEK 6: CAD drawing submitted for fabrication

The week after presentation, helped me to address very important details regarding the current insulator and rail. Also, it helped few modification on the current pick up mechanism to pivot about a joint. I have addressed those details as shown in the figure below. Using SolidWorks, I was able to calculate the tolerance angle as the current pick up mechanism is raised for a maximum on 1 in. a 10 degree angle will be used on the top pivot point.  Additionally, I have sent the final drawing to Turpo Manufacturing company for fabrication. They will be machining some on the parts on this mechanism in exchange of advertising. finally I'll be working on the unistrust channels which will hold our current rail.